/
Maintenance Schedule

Maintenance Schedule

Notice If you have any issues that are not addressed here please get in touch with us at: support@pantheondesign.ca

Maintenance Schedule

Time Interval

Recommended Service

Time Interval

Recommended Service

Daily or prior to every print (Pre-Check)

Prepare the Printer

  • Clean the print sheet

  • Coat print sheet with release/bonding agent

  • Clean the Nozzle/hotend

  • Check filament amount and material and moisture level

Monthly or after 15kg of Filament

Every 3 months or 45kg of Filament

  • Replace nozzle

  • Inspect hot end for plastic leakage and wire damage

  • Inspect part cooling duct for plastic build-up

  • Inspect print sheet

  • Check filament guide tube for wear

  • Check guides/ballscrews for dust and debris, clean if needed

Every year or 180kg of Filament

 

Related content

Troubleshooting
Troubleshooting
More like this
HS3 Specifications
HS3 Specifications
Read with this
HS3 Setup and Safety
HS3 Setup and Safety
Read with this
Normal Operations
Normal Operations
Read with this
Pantheon Slicer
Pantheon Slicer
Read with this
Ball Screw Linear Wobble
Ball Screw Linear Wobble
Read with this

www.pantheondesign.com